13,500 SF high-density lab & data hall featuring 90 cabinets and benches with racks capable of achieving 500+ kW.

  • (8) 750kW CDUs in a 2N redundant configuration.
  • Benches with liquid drops, multiple voltages of power, and CDA available.
  • Automated shutoff mechanical, shunt tripping, integrated with leak detection in the BMS for an advanced controls system.
  • Current landing site for GB200, GB300, and VR deployments.

This project was delivered on schedule, then partially retrofitted to accept higher density equipment. Flexible design allowed this site to accommodate equipment it was not originally designed for, helping the end user achieve their goals.